A pedestrian bridge: re-inventing the public sphere (14)

(14th in a series of posts on Walkability and Bikeability)

Spring has sprung.

The sun is out pretty good as Gadfly writes this Saturday morning.

The 5k’s are gearing up.

The whoosh of bike tire pumps fills garages.

And the pedestrian bridge is budding.

The PB is among a list of things that might be funded through the Casino Transfer Tax when the Sands sale is finalized.

Says so right in the 2019 City budget p. 278

And Tuesday night City Council approved grant applications for funds for a feasibility study.

Increased walkability and bikeability are City goals.

A PB would firm up a corridor from Illick’s Mill across the river to the Greenway and on to the Saucon Trail, which now goes down toward Center Valley, where there are plans for even more connections southward.

A PB also would be an important nexus for the Delaware and Lehigh Trail along the Lehigh River from Jim Thorpe to Easton — and thenceforward to Philly.  We could be tempting those bikers to stop off in Bethlehem.

Connecting corridors are a big thing these days in the walking and biking world.

They are happening all around us, to everybody’s social and economic benefit.

Gadfly didn’t think he could be roused any higher about the possibility of a PB in Bethlehem.

But Doug Roysdon brought an emotional ratchet to Tuesday’s City Council meeting.

Eschewing (good SAT word) familiar arguments for a PB like parking, safety, bridge success in other towns, Doug took a series of such new tacks as

  • the PB would turn Bethlehem into a “completely different destination”
  • it would provide “the nicest night-time walk in all the Lehigh Valley”
  • it would provide the rather unique opportunity of a historic tour by bike
  • if you lived in one side of the river and worked on the other, you could live a life walking to work, enjoying the benefits of better health and saving car expense money
  • it would help “create a young town”

Doug saw a PB as “reinventing the public sphere.”

Watch Doug on YouTube, or listen to him here.

He took “the road not taken” in effectively giving us more to think about regarding the value of a pedestrian bridge.

Lehigh Northside parking lot mystery partially explained (24)

(24th in a series of posts on Lehigh University)

Deep Throat surreptitiously (good SAT word) passed Gadfly a new document regarding the new Lehigh University parking plan that contains the following bullet:

  • There will be a commuter lot added on the SteelStacks/Sands property off of Third Street and Founder’s Way, and a shuttle serving this commuter lot. More details about the commuter lot will be shared with the campus community by the end of March. The university will be funding the cost of this space, so there will be no cost to the employee to use this lot.

So why the big mystery?

Why couldn’t Lehigh simply say, yes, Gadfly, we announced in September and said nothing different until this week that there would be a Northside Commuter lot but actually it’s a commuter lot on the southside now — 3rd and Founder’s Way.

Instead they played dumb, as if there were no off-site commuter lot, and got Gadfly’s pee all warm.

No doubt a good reason for stiffing me. No doubt above Gadfly’s pay grade. Big business.

In the recent document, Lehigh indicates they have made some changes. They indicate that the first come/first served system has been dropped, and people on lower campus seem assured now of parking close to their workspace. Sounds like “bumping” has been eliminated or diminished.

Lehigh is, of course, still silent about the contract workers — Sodexo, ABM, BrightView, etc. They are not Lehigh employees, and thus are not referenced, though they clearly must be affected by the parking reorganization, and are separated out as such in the Lehigh July 2018 parking study (p. 16 if my notes are correct).

The 3rd and Founder’s Way lot is 3/4’s of a mile from Farrington Square at the bottom of lower campus, about the same distance as the “mythical” Northside lot.

Thus, I still don’t have an answer to my basic question of what’s happening with this lower-paid group, at least some of whom no doubt are Bethlehem residents and taxpayers.

But even if they aren’t Bethlehem residents and taxpayers, are the lower-paid workers being, as it were, “forced” to suffer some hardship to park off-site because they can’t afford the parking fee?

Remember that Lehigh has made a conscious decision to build on parking lots, losing approx. 500 spaces.

I keep saying that there may be no problem, but I’d like somebody who has thought about these people to tell me so.

Lehigh obviously made changes in the original program because of legitimate concerns, stiff questions, and resistance from faculty and staff on campus.

The contract workers probably have no similar voice or power.

Are they being treated fairly?

Bethlehem going green

(The latest in a series of posts relating to the environment, Bethlehem’s Climate Action Plan, Bethlehem’s Environmental Advisory Council)

Dawn Nixon, “Lehigh Valley leaders discuss efforts to go green.” WFMZ, March 12, 2019.

On March 12 our Mayor Donchez joined with representatives from Allentown and Whitehall at the Lehigh Valley Mayors’ Sustainability forum  to discuss Valley efforts to Mayor sustainability“go green.”

The Mayor talked of converting to LED lights; working with UGI and PPL to reduce the amount of gas used by local businesses; such key components as green buildings, energy efficiency and conservation, water and wastewater systems and climate friendly transportation; and plans for a consultant to assist the city in developing a climate action plan.

“Mayor Donchez closed the forum’s discussion by commenting on how any efforts made by individual cities benefit the entire Lehigh Valley. ‘The more we work together on key issues, the better the Lehigh Valley will be as a whole,’ he said.”

Here for us are the key slides from the Mayor’s presentation showing work done and on the radar:

Sustainability 1

Sustinability 2

Sustinability 3

Susatainability 4

It’s Friday, March 22, do you know where your local Climate Action Plan is?

You gotta listen!

The spectator value of last night’s City Council meeting from Gadfly’s roost in the cheap seats was totally front-loaded in the public comment space.

Yep, Council members did their business — necessary business — good business — especially involving $money$ (and big money, ’twas!) and approving resident members of City committees (have you volunteered lately?) and approving resolutions (especially of interest to Gadfly followers, resolutions of feasibility studies for the Rose Garden and a pedestrian bridge).

But you gotta listen to the quintet of resident speakers. It will only take you 15 minutes.

Barbara Diamond (min. 2:45) delivering Bethlehem Moment 8 on “Operation Book Move,” the community effort in 1967 to move all the books from the old library at New and Market to the current location in one day, and introducing 91-year-old Ed Beighe and his wife Eleanor — Ed was project chairman for the move.

Beth Behrend (min. 5:50) promoting a plan from the Bethlehem Environmental Advisory Council to ban single-use plastic bags, with follow-up by Gadfly #1 Stephen Antalics (min. 12:33).

Bill Scheirer, Gadfly #2 (min. 8:55) presenting a wise disquisition on two major past problematic episodes before Council — 2 W. Market and the proposals from the Bethlehem Parking Authority — episodes well covered on Gadfly — spurring us to clear thinking, which requires weighing all relevant information.

Doug Roysdon (min. 13:04) supporting the resolution on the table (which passed) to seek funding for a feasibility study for a pedestrian bridge — which he did in a strikingly exciting way.

Gadfly will come back to talk about some of these presentations individually later, but he encourages you to listen now to sense how interesting these City Council meetings can be and how valuable public participation is.

And to be turning out or tuning in the first and third Tuesdays of the month.

You can catch the meetings live. Or at your leisure. You can even binge-watch. Just like Netflix.

Great opportunity.

Watch City Council Live (if you don’t have the hard-to-get tickets to be there in person) tonight at 7pm!

City Council meets the first and third Tuesdays of each month at 7pm in the Town Hall rotunda. That means tonight. These meetings are now live-streamed on the Council webpage and on YouTube.

On the surface, the agenda doesn’t look too “exciting.” But a good many Gadfly followers will be interested that approval of resolutions to seek feasibility studies for the Rose Garden and a pedestrian bridge are on the agenda.

But you never know what might happen. In any event, Gadfly followers know that he is enamored of our resident voices during public comment. And he likes to record and distribute them. Democracy in action.

As example, he captured these comments at the recent Planning Commission meeting: citizens Murdock Saunders, Anne Evans (min. 3:08), and a woman whose name he couldn’t catch (8:18) cautioning the PC about a proposal for student housing in their neighborhood.

Listen to the clear, courteous, firm, fair, reasoned voices. Speaking up. Exercising their right. Your fellow citizens in action. Makes you proud. Makes you tingle.

But, though the agenda looks docile, anything could happen tonight. Impossible to anticipate.

But what if we could anticipate some things of interest?

Gadfly followers know that he has been making “modest proposals” about the various City authorities and boards making periodic presentations about what’s going on in their worlds that affect us — presentations that we could advertise so that you could tune in.

So that, for instance, you would know, say, that you could hear from the Parking Authority tonight about what’s going on in their hands and heads?

If you like that “modest proposal,” write your Congressperson . . . er, Councilperson. Email addresses on the Gadfly sidebar.

So, if you aren’t coming in person tonight, at 7pm go to the City web site >>> Quick links (bottom left) >>> City Council Meeting Agendas and Documents >>> “View Live Stream City Council Meeting” at the top of the page.

On that same page you can find the agenda for the meeting, any pertinent documents for the meeting – and, for later reference, the print version of the minutes plus audio and video recordings of the meeting.

You can also go to YouTube at <City of Bethlehem Council> for live-stream and archiving.

But being there is always best! Gadfly will save a seat for ya.

More info on Lehigh Valley Academy (16)

(16th in a series on Education and Charter Schools)

Timely to our discussion is the showing of the “Backpack full of Cash” documentary this Thursday, March 21, 6:30pm – 8:00pm at NITSCHMANN MIDDLE SCHOOL, sponsored by Bethlehem Proud Parents – Free!

This info from Sara Satullo and Karen Beck Pooley much appreciated:

Sara:

IB is integrated into the curriculum, but not all students earn an IB degree. To do so, students must take exams akin to Advanced Placement tests. Not all do so. This is from the 2016 charter school renewal hearing for the school: “The school’s Class of 2016 included 50 graduates and 11 of the students were awarded a full IB-diploma, while a number earned some certificates but did not take all of the exams, Mauser [Susan Mauser, LVA CEO] said.”

Karen:

“Why Bethlehem school board approved charter school agreement.” Morning Call, November 29, 2016.

in 2016, when the LVA charter was up for renewal, Karen writes that the Bethlehem School Board generated “a long list of concerns and several reasons for denying the charter outright” and sought to negotiate an amended charter, but LVA “rejected all of [their] requests and offered no realistic counterproposals.”

Karen indicates that our Board was hamstrung by experience with the state Charter Appeals Board. Gadfly has read elsewhere that the Charter School lobby is among the most powerful in the state.

Provisions rejected by LVA included ceasing to cover school lunches, aligning LVA and BASD calendars to reduce transportation costs, and holding monthly public Trustee meetings.

Gadfly has an appointment with Dr. Roy next week on the questions Gadfly posed at the end of his last post.

H.D.: “If she went away [from Pennsylvania] her spirit would break; if she stayed, she would be suffocated” (11)

(11th in a series of posts on H.D.)

Finding H.D.: A Community Exploration of the Life and Work of Hilda Doolittle

The next event in this year-long series is a panel discussion on “H.D. and the Natural World,” Tuesday, April 16, 6:30-8:00pm at the Bethlehem Area Public Library.

Gadfly is following this wonderful program on Bethlehem-born world-renown author H.D. (1866-1961), the Lehigh Valley’s most important literary figure – who most of us, Gadfly included, know very little about.

Here again is the full recording of Prof. Mary Foltz’s lecture on “Challenging Limited Understandings of Gender and Sexuality” on March 6.

After the intro by Jennie Gilrain, Mary introduces the overarching questions we should think about during her talk (min. 2:30), introduces H.D.’s The Gift (min. 5:01), discusses and interacts with the audience about two poems by Rosa Lane for context (min. 8:04 and min. 20:54), and concludes this context by showing how the Lane poems set up four themes that characterize H.D.’s work (min. 30:25). Mary turns to The Gift for the main focus of her talk (min. 32.18) and the Q ‘n A follows (min. 1:14:50).

So now let’s think about the second slice of Mary’s lecture.

Gadfly is straight.

How can he know what’s it’s like to be . . . not straight?

How can he know what it feels like to be lesbian, gay, bi-sexual, transgender, queer?

Literature is a way of knowing.

Mary tells us that H.D., the Lehigh Valley’s most important literary figure, is a bisexual feminist poet.

How can Gadfly understand H.D. and her criticism of the damages of sexism and patriarchy?

Mary fosters that understanding of people like me who “will not know the pain of encountering others’ hatred as you express femininity or masculinity because you’ve been assigned a sex at birth that does not match your gender” through a discussion of two short poems by lesbian poet Rosa Lane.

Poetry must be heard.

Gadfly encourages you to read the Lane poems printed below along with listening to them read by members of Mary’s audience — people just like you.

H.D. 3

Read them. And think about them for a couple minutes. Then listen to Mary and her audience talk about them.

Rosa Lane, “Tomboy’s Toggle to Love”

Rosa Lane, “Boats Named Women”

Rosa Lane 2

Mary took the poems individually, got the audience talking about them, and then pulled things together in her words.

Gadfly would love to think you have the time to listen to the segments on each poem – but you must, YOU MUST listen to at least one!

So here are audio clips of the full segments on each poem with some teasers from Mary’s wrap-ups.

1) “Tomboy’s Toggle to Love”

“The child expressing lesbian desire in this poem, the longing to share love for another woman, feels like an alien in her own home. . . . What she is looking for is a community, a tribe, of others that can affirm her desire as beautiful and valuable. She sends a message in a bottle, but hears nothing back from the world, nothing washes ashore, that indicates she is not alone in her difference. . . . the desire for another woman is not something that she feels could be erased, her course is set from childhood to be lost to her community and family because of her difference.”

2) “Boats Named Women”

“This poem addresses how women are the vessels that support men in their journeys through the world in this fishing community. Women’s bodies. . . . are gutted hulls, not subjects in their own right, but bodies devoted to pleasuring men. . . . sexual intimacy here is described as the mother chopping off a part of herself to give to her partner.”

Mary then finishes her introduction to H.D. by setting out four themes that characterize H.D.’s work.

  • institutionalized sexism limits possibilities for white women
  • normative heterosexuality defines women’s sexuality as being objects of desire for men rather than subjects of desire
  • documenting the desire to surpass limited understanding of what women’s bodies are for
  • imagining and enacting alternatives to gender norms for women

H.D. 5H.D., Mary tells us, felt suffocated in Bethlehem and Philadelphia even as she loved her family and community.

“If she went away her spirit would break,” H.D. wrote of herself, “if she stayed, she would be suffocated.”

That tension tears Gadfly up.

Another slice of Mary’s lecture to think about coming in our next post. Moving there into a discussion of H.D.’s work itself.


Remember: the next event in this year-long series is a panel discussion on “H.D. and the Natural World,” Tuesday, April 16, 6:30-8:00pm at the Bethlehem Area Public Library.

Charter schools: What makes Lehigh Valley Academy so special for BASD students? (15)

(15th in a series on Education and Charter Schools)

Timely to our discussion is the showing of the “Backpack full of Cash” documentary this Thursday, March 21, 6:30pm – 8:00pm at NITSCHMANN MIDDLE SCHOOL, sponsored by Bethlehem Proud Parents – Free!

Half of BASD’s total charter school enrollment is in LVA, for whom BASD pays $12m/yr.

LVA is seeking $45m for a new building and may be increasing its enrollment.

“30 percent of [LVA’s] students are Hispanic, 36 percent are white and 12 percent are black. Almost 50 percent are considered economically disadvantaged. The charter school has a 95 percent graduation rate, almost 10 percentage points above the state average.” (from Morning Call)

What makes Lehigh Valley Academy charter school so special? What’s the draw?

Please bear with a long description. Remember that as taxpayers we are paying $12m/yr. for LVA.

LVA’s distinctive feature seems to be the International Baccalaureate program (IB).

IB’s distinctive feature seems to be “International Mindedness.”

“LVA is the only fully authorized International Baccalaureate World School in Pennsylvania that offers an IB continuum to all students in grades K-12. Beginning with full-day kindergarten and continuing through a student’s senior year, LVA emphasizes inquiry-based learning and critical thinking to prepare a student for higher education and the 21st century globalized environment.”

“The aim of all IB programmes is to develop internationally minded people who recognize their common humanity and shared guardianship of the planet. Central to this aim is international-mindedness. International-mindedness is a multi-faceted and complex concept that captures a way of thinking, being and acting that is characterized by an openness to the world and a recognition of our deep interconnectedness to others.”

“To be open to the world, we need to understand it. IB programmes therefore provide students with opportunities for sustained inquiry into a range of local and global issues and ideas. This willingness to see beyond immediate situations and boundaries is essential as globalization and emerging technologies continue to blur traditional distinctions between the local, national and international.”

“An IB education fosters international-mindedness by helping students reflect on their own perspective, culture and identities, and then on those of others. By learning to appreciate different beliefs, values and experiences, and to think and collaborate across cultures and disciplines, IB learners gain the understanding necessary to make progress toward a more peaceful and sustainable world.”

“An IB education further enhances the development of international-mindedness through multilingualism. All IB programmes require the students to study, or study in, more than one language because we believe that communicating in more than one language provides excellent opportunities to develop intercultural understanding and respect. It helps the students to appreciate that his or her own language, culture and worldview is just one of many.”

“International-mindedness is also encouraged through a focus on global engagement and meaningful service with the community. These elements challenge the student to critically consider power and privilege, and to recognize that he or she holds this planet and its resources in trust for future generations. They also highlight the focus on action in all IB programmes: a focus on moving beyond awareness and understanding to engagement, action and bringing about meaningful change.”

IB learner profile
———————–
In grades 11-12, IB offers 2 tracks:

Diploma Programme: Prepares students for effective participation in a rapidly evolving world. This is a demanding two-year curriculum that meets the needs of highly motivated students,and leads to a qualification that is recognized by leading universities around the world.

Career-related Programme  is a framework of international education that incorporates the values of the IB into a unique programme addressing the needs of students engaged in career-related education. The programme leads to further/higher education, apprenticeships or employment.
————————————–
The Diploma Programme curriculum

The Diploma Programme (DP) curriculum is made up of six subject groups and the DP core, comprising theory of knowledge (TOK), creativity, activity, service (CAS) and the extended essay. Through the Diploma Programme (DP) core, students reflect on the nature of knowledge, complete independent research and undertake a project that often involves community service.

The three core elements are:

  • Theory of knowledge (TOK), in which students reflect on the nature of knowledge and on how we know what we claim to know.
  • The extended essay, which is an independent, self-directed piece of research, finishing with a 4,000-word paper.
  • Creativity, activity, service, in which students complete a project related to those three concepts.

How is TOK structured?

As a thoughtful and purposeful inquiry into different ways of knowing, and into different kinds of knowledge, TOK is composed almost entirely of questions.

The most central of these is “How do we know?”, while other questions include:

  • What counts as evidence for X?
  • How do we judge which is the best model of Y?
  • What does theory Z mean in the real world?

Through discussions of these and other questions, students gain greater awareness of their personal and ideological assumptions, as well as developing an appreciation of the diversity and richness of cultural perspectives.

As part of theory of knowledge (TOK), each student chooses one essay title from six issued by International Baccalaureate (IB).

The titles change in each examination session. Upcoming and past TOK questions include:

  • “To what extent are areas of knowledge shaped by their past? Consider with reference to two areas of knowledge.”
  •  “’There is no reason why we cannot link facts and theories across disciplines and create a common groundwork of explanation.’ To what extent do you agree with this statement?”
  • “There is no such thing as a neutral question. Evaluate this statement with reference to two areas of knowledge.”
  • “’The task of history is the discovering of the constant and universal principles of human nature.’ To what extent are history and one other area of knowledge successful in this task?”

Some examples of the 4,000 word extended essay are:

  • “An analysis of costume as a source for understanding the inner life of the character”
  • “A study of malnourished children in Indonesia and the extent of their recovery after a period of supervised improved nutrition.”
  • “Doing versus being: language and reality in the Mimamsa school of Indian philosophy.”
  • “The effects of sugar-free chewing gum on the pH of saliva in the mouth after a meal.”
  • “To what extent has the fall in the exchange rate of the US dollar affected the tourist industry in Carmel, California?”
  •  “What level of data compression in music files is acceptable to the human ear?”

—————————————-

So the above should give us some idea of what the distinctive feature of LVA is.

Gadfly is not sure if the IB is required of all students or it is an option, a track. Need to find that out.

Gadfly also needs to know more about 1) how LVA is promoted, publicized (if at all) among BASD students, and 2) whether both BASD and LVA have done surveys on why these students are choosing to attend LVA.

So, with luck, more info later.

How are you feeling about the $12m?

Remember: timely to our discussion is the showing of the “Backpack full of Cash” documentary this Thursday, March 21, 6:30pm – 8:00pm at NITSCHMANN MIDDLE SCHOOL, sponsored by Bethlehem Proud Parents – Free!

The Gadfly at 6 months

The Gadfly is 6 months old today.

Time to reflect.

The statement of purpose on the About page begins with “God.”

Pretty pompous.  Gadfly 61

But I think I’ll leave it.

At least for another 6 months.

How else explain the “hang time” of Antalics and Scheier?

I think of gadfly as a special breed – Genus Antalicus.

Gadflying is a calling.

I think of gadflies as unofficial official representatives of the public.

Gadflies have a keen nose for inconsistency and hypocrisy.

Gadflies are institutional  memory.

And it’s not about winning.

It’s about witnessing.

I still believe in the fantasy Norman Rockwell small town.

I like to think of Bethlehem as that kind of small town.

I like to think of model democracy here.

I love the voices at public comment

whether about barking dogs or building high-rises.

The ability to speak is sacred.

Freedom of Speech
Norman Rockwell, Freedom of Speech

And good conversation makes community.

I believe that differences don’t have to divide.

Bethlehem needs a place for people to talk.

People tell me Gadfly fills a need.

Not enough people take advantage.

Not enough people initiate conversation.

Gadfly isn’t just Gadfly’s.

Gadfly needs more voices.

Gadfly wants you.

Speaking on Gadfly is empowering.

Speaking is exercising franchise.

Let there be more speakers on Gadfly.

Gadfly is grateful.

Followers are oxygen.

Onward.

A tip o’ the hat and a wave o’ the wings to Al Bernotas for the Gadfly image.

“Ganbi,” Ron, “Ganbi”

(3rd in a series of posts on Ron Yoshida’s pilgrimage)

https://88-photos.com/

Yoshida 5

A sign on the trail counsels pilgrims to Ganbi — “keep trying.” A word we all need to put on a stickie affixed to our bathroom mirror.

Yoshida 6

Meotoiwa — “husband and wife together.”  55 years married, I teared up.

Yoshida 7

Are you following Ron? Day 13 of his pilgrimage.

https://88-photos.com/

Need for a more robust discussion on the state of the City

(The latest in a series of posts on City government)

In one of his “modest proposal” posts a few posts back, Gadfly whined as gadflies tend to do (sigh) about the venue for the Mayor’s “State of the City” address, the audience for it, and the dissemination of it.

The content of the Mayor’s address is very positive, very upbeat, as such addresses are wont to be, but, I think, legitimately so. And Gadfly has admitted to wishing that the Mayor seek the spotlight a bit more and foster a widespread positive feeling about the good news among “the people.”

But the dissemination of the address seems better this year than last. Virtually immediately, there was an “announcement” on the top page of the City web site with a link to the audio of the address accompanying the Mayor’s slides. And there is a link to the printed text of the address at the top of the quick links on that page as well.

And the Call article that day is a prominent size: “Bethlehem mayor showcases city’s untold development story.” (The headline of the Call print version is “Bethlehem mayor stressed development; Donchez highlights investment numbers in State of the City address.”)

But that’s still not enough.

Gadfly’s whine is basically centered on the venue and the audience: As the Call says, “Donchez delivered the remarks Thursday to 250 business people at the ArtsQuest Center at SteelStacks.”

I say again. That just seems wrong to me. Symbolically. Probably not politically.

You aim your speech at your audience.

And, though the Mayor’s address contains much more, the Call headlines saw the address primarily through the lens of that venue and audience, focusing on the Mayor showcasing, stressing, highlighting development – even to the drama of revealing to readers an “untold story” of development.

And astronomical numbers dominate the content of the news story: one imagines an audience of slick-haired Gordon Gekko’s salivating at the Mayor’s financially erotic language: 190 million, 295 million, 54 million, 370 million, 22 million, 15 million . . . 1 billion! 1.3 billion! Even Gadfly swooned.

And, though there is more in the Mayor’s words, the Call reports that post-address questions centered, as one might expect in that venue and with that audience, only on “two big projects,” Martin Tower and the Sands.

Gadfly sees the “State of the City” address as an exciting moment for robust wide-ranging discussion from a broad set of perspectives.

We didn’t have that.

So Gadfly’s been thinking about a “modest proposal” of his own for next year.

Assembling, say, four people to complement the Mayor’s address with posts on Gadfly.

Complement not compete with, criticize, answer, or attack like what happens with our national “State of the Union” address.

Complementary views.

Aimed at fostering a sense of community.

The state of the City seen from a variety of angles, through a variety of lenses, using different metrics. Equally valid.

Gadfly hasn’t been around long enough to know. Who are the wise heads representing a range of perspectives that he might invite next year to fill this delicate and valuable role?

Give him your suggestions–

Wait till Monday! (23)

(23rd in a series of posts on Lehigh University)

The Northside Commuter Lot mystery.

Anti-climax.

Gadfly did not speak at the Planning Commission yesterday.

Deep Throat advised him to hold his water for 96 hours.

To look for Lehigh to speak to the campus community Monday.

Questions to be answered.

 

Martin Tower: compare your ideas with the developers (7)

(7th in a series on Martin Tower)

Ever closer to implosion. Will Gadfly have to wear dark glasses? Mask, for sure — he’s downwind.

Nicole Radzievich, “Developers reveal what’s in store for the Martin Tower site.” Morning Call, March 13, 2019.

After Martin Tower vanishes from Bethlehem’s skyline this spring, developers plan to replace it with a $200 million development that includes 528 apartments, a 132-room hotel, a restaurant, three medical office buildings and a gas station.

The residential part of the project would be arranged in three-story garden apartments along the eastern side of the 53-acre property with the three-story medical offices and other commercial development closer to Eighth and Eaton avenues, which is near other medical office buildings.

The gas station/convenience store would be near the corner of Route 378. A tennis court and pool complementing the apartment complex are also planned.

There would be eight acres of open space along a tree-lined hillside on the eastern edge of the property and sidewalks that connect to the adjacent streets, trails and parks, according to a sketch plan submitted by owners Lewis Ronca and Norton Herrick.

The Planning Commission is expected to review it as a sketch plan at its April 11 meeting. Sketch plans are discussed but not voted on by the Planning Commission. The Planning Commission votes on land development plans. . . . The concept calls for 74 percent residential, 14 percent office and 12 percent commercial/etail. The property would be subdivided into nine lots.

Alicia Miller Karner, director of the city’s community and economic development department, also raised questions about the lack of density and hoped to work with the developer to make sure it includes features that emphasize walkability and bicycle safety.

“Sounding Board: What would be best use of Martin Tower property?” Morning Call, March 14, 2019.

See above. This might be too late. But Call readers answer the question: what would be the best use of the property?

  • senior living apartments with coffee shop and bus service
  • let market forces decide
  • Amazon headquarters site
  • high-end apartments
  • a Movie Tavern

Gadfly asks time before the Planning Commission today (22)

(22nd in a series of posts on Lehigh University)

Thursday, March 14

Brent, Darlene, and members of the Planning Commission (except Ms. Cohen, for whom I do not have a permissible email). Lawyer Durso has been copied through her firm’s web site.

Good People:

Take #5

I understand that the Wind Creek Sign Waiver Request is on the agenda for today — apparently a visible sign that the long-awaited casino transfer is near. Exciting times. Great.

I didn’t hear that the Lehigh matter would be added to the agenda, but then again I see that I didn’t ask for notice so that I could prepare if it were possible for me to make a presentation. Let me ask now. Is it possible that we can re-visit 124 E. Morton today? Can I be recognized?

As more evidence that something is amiss in seeming City and Lehigh professed ignorance of this off-campus parking option before the PC: in an Oct./Nov. “additional FAQ’s” document, Lehigh answered these questions regarding the “Northside Commuter Lot” from concerned members on campus.

1) “Will there be a bike share location available at the North lot?” (You will remember that I believe it was Lawyer Durso at the very end of the 2/21 meeting who emphasized bikes as part of the solution in relation to the questions I raised. But the answer was no help from bikes here.)

2) “Will the North Lot shuttle schedule be expanded over time to accommodate people who work outside the designated hours?”

3) “How long will the wait be for the North Lot shuttle?”

4) “If the Commuter lot option is selected, where will staff park during Musikfest, Celtic Fest . . . ?”

Can there be any doubt that the Northside Commuter Lot is a definite part of the Lehigh parking plan though it was not included in their parking study presented to the City?

I remind you that Lehigh has announced plans to commence the first-come, first-served sign up system April 1, and on Feb. 26 the Lehigh representative announced to the Mayor’s South Side Task Force that construction on 124 will begin in June.

Now is the time to get some inconsistencies straightened out.

I hope to hear from you about today’s meeting.

Ed Gallagher

Now where was I? Oh, yes, charter schools (14)

(14th in a series on Education and Charter Schools)

Gadfly went to sleep on charter schools. We were beginning to think about how they affect the Bethlehem Area School District. Through cost. Taking resources from other needs. They are funded through our tax dollars. And thus they affect us all through our wallets.

It’s been a month since Gadfly posted on charter schools. Let’s pick up the ball again.

In post 11 Where do all the students go and why? (11) we saw that approximately 2100 BASD students attend charter schools, about 13% of the total student population, at a cost of 29 million in charter tuition this year, which is roughly 10% of the budget.

And we saw that BASD-area students go to 12 charter schools, but about half to the Lehigh Valley Academy Charter School.

Gadfly suggested that we take a closer look to try to figure out why so many are going to charter schools and especially to LVA.

Gadfly has to admit he kinda likes the idea of choice.

We can see some differences in the schools that would account for their attraction.

Two follow structured national and international programs. LVA is “an IB World School.” International Baccalaureate. Circle of Seasons is based on the Core Principles of Public Waldorf Education.

Several have a special focus. Like the Arts. For instance, our Charter Arts on 3rd St. is “a place where being an artist is celebrated.” Admission is “academically blind.” Students are accepted based only upon their artistic talent and potential. They audition for acceptance into one of seven arts majors: dance, instrumental music, literary arts, production design, theatre, visual art, and vocal music

Interesting. If you have a special talent you want to develop, or if you simply believe that such training has a general beneficial and perhaps utilitarian value, you can choose a school with a specific focus.

One looks very career/job oriented. Executive Education says “Our unique business education program is designed to meet the needs of the Lehigh Valley.  With the growth of the Neighborhood Improvement Zone, we want to be able to provide quality employees for new jobs that are made available by this growth.”

Several have a multicultural or dual language emphasis. Appealing, perhaps, to immigrant populations.

The Lincoln founder “dreamed” of opening a public school where “at-promise” children and youth, who live in “at-risk” environments, and who are deemed “at risk” by our society, would receive a free, high-quality public education. As one of their students said, it was created “for students who want or need a second chance to have a better future.”

One has a mission statement quoting the Great Law of the Iroquois Confederacy. Wow!

Interesting range.

And like I said, I kinda like the idea of choice.

So Gadfly is getting more and more the idea that the “problem” with charter schools is not so much the curricular aims but how the schools are funded and how they are accountable.

Let’s come back next time and look in a bit more detail at LVA, the choice of about half of our BASD charter school students.

probably the last time to set the record straight (21)

(21st in a series of posts on Lehigh University)

Tuesday, March 12

Brent, Darlene, and members of the Planning Commission (except Ms. Cohen, for whom I do not have a permissible email). Lawyer Durso has been informed of my request below through her firm’s web site.

Good People:

Take #4

Since I have provided all parties with access to substantive materials that indicate that a Northside Commuter Lot, though not in the parking plan submitted to and approved by the City and apparently unknown to the Director of Planning and Zoning, is part of the Lehigh parking plan rolled out to employees in September 2018,

and since Lehigh has announced plans to initiate its parking plan around April 1,

and since Lehigh’s implied denial of the very existence of that lot in their thinking about making up for lost parking spaces on campus made me look rather foolish in front of the Planning Commission, the public, and the press,

I respectfully request that 124 E. Morton be added to the agenda for the Thursday March 14 meeting.

It will probably be the last time to set the record straight before Lehigh’s plan becomes operational.

Ms. Heller and Chairman Melosky, I will be glad to make a presentation based on the presence of the Northside Commuter lot in Lehigh documentation if that is permissible.

Ed Gallagher

Will the Planning Committee reconsider the Lehigh Northside issue? (20)

(20th in a series of posts on Lehigh University)

from the Planning Commission meeting 2/21/19

The gadflies of the insect world are nasty, pesky critters. Your Bethlehem Gadfly of the homo sapiens world is surely earning his sobriquet (good SAT word) with this thread on Lehigh University.

And you may be tired of it.

What’s your beef, Gadfly Gallagher?

There are two elements to this “case” bound to engage a gadfly:

1) what seems like conscious and willful inconsistency between Lehigh’s statements and the actuality

2) what may be (not sure) potential unfairness to the “little guy”

In relative briefness, let me lay it out once again:

Lehigh is constructing three major buildings on existing parking lots and, in total, by its own published figures is thereby losing 518 existing parking spaces on campus, almost the equivalent of the new New St. Garage. Lehigh’s July 18, 2018, parking study, approved by the City, indicates that Lehigh meets all zoning requirements and that all lost parking space will be absorbed on campus. That claim of absorbing all lost parking spaces on campus was affirmed by Lehigh before the Planning Commission, even when questioned by Gadfly at a meeting.

However, when Lehigh rolled out its new parking plan in a September 10, 2018, memo to employees and in perhaps a score of large and small group meetings with employees in the Fall, there was in the plan an off-campus Northside Commuter Lot at 123 W. Lehigh St., ¾’s of a mile and a good 15-minute walk from Farrington Square at the very bottom of main campus – a lot not mentioned in the July study submitted to the City. In the documentation circulated on campus to employees, bus service from that Northside lot to Farrington Square, where employees can connect with other buses to their work location, is described.

It seems clear from Lehigh documentation that all parking demand cannot be satisfied on campus and that the Northside lot is part of several elements to resolve that shortfall. In addition, the new Lehigh parking plan involves an annual fee of $500 for most spaces close to work locations. Some people might choose to park in the Northside lot because it is free. But it’s possible that others – among them Bethlehem residents and taxpayers – will be forced into that lot because they can’t afford the fee.

The fundamental problem, though, is that neither Lehigh or the City has recognized the inclusion of the off-campus lot in testimony before the Planning Commission, despite clear, overwhelming evidence that it is part of the Lehigh plan. Gadfly would like to see the existence of the off-campus lot recognized before the Planning Commission at which time any potential unfairness to Bethlehem residents and taxpayers can be addressed. There may be no unfairness, but we won’t know that without focused discussion.

Well, that wasn’t so brief, was it?

So here’s audio of the public comment section of the 2/21 Planning Commission meeting:

  • in the beginning “with-it” PC members do ask about parking
  • Gadfly makes his soulful pitch for the underdog (min. 1:20)
  • the Lehigh lawyer responds (min. 6:55)
  • there is a brief interchange between the lawyer and Gadfly (min.8:20)
  • astute PC members question again, and City official Ms. Heller resolves the discussion for the PC (9:20)
  • an astute concerned PC member, though, suggests an addition to the main motion before the vote, indicating still some uncertainty about parking (min. 12:25)
  • also comically (to Gadfly anyway) interesting is the Lehigh lawyer implying bike parking as part of the solution to the specific question about the specific kinds of people Gadfly is concerned about (min 13:50)

Lehigh plans to begin parking allocation around April 1 (3 weeks) for a July start to the new plan.

The Planning Commission meets next this Thursday March 14.

If anything is to be done, the time is now.

As you might note from his last letter to Lehigh, the City, and the PC, Gadfly has asked that the authorization given at the 2/21 meeting be revoked till the issue of the Northside lot and potential unfairness to City residents and taxpayers is thoroughly aired.

Toppling the (Martin) Tower (5)

(5th in a series on Martin Tower)

Nicole Radzievich, “Martin Tower will be imploded; mayor says could happen by end of April.” Morning Call, March 7, 2019.

Nicole Radzievich, “Why Martin Tower’s historic designation doesn’t preclude its demolition.” Morning Call, March 8, 2019.

The denouement inches forward.

Gadfly lives in the debris path. Sigh.

The resistance:

Change.org: Refuse To Patronize Anything On the Martin Tower Land Without The Tower Remaining

People who have any connection with the city of Bethlehem, Pennsylvania, or Bethlehem Steel, are very unhappy with the news that Martin Tower is said to be taken down in 2019. As a result of this news, we, the signatories, do not wish to support or patronize any businesses that will build on the Martin Tower property after it has been taken down. We want to see this building renovated, and turned into something beneficial to the community.

Martin Tower is an important part of the city’s history. It is listed on the National Register of Historic Places. It is a landmark that can be seen for miles. It is an important part of Bethlehem Steel’s history, just as much as are the Blast Furnaces. This building could be an attraction, such as a Visitor’s Center, offices, and provide living space. Martin Tower is a local treasure and should be treated as such.

Facebook: “Save Martin Tower”

Martin Tower is a skyscraper in Bethlehem, Pennsylvania that was built as the world headquarters for Bethlehem Steel. Since Bethlehem Steel closed and left the Tower, other companies occupied the Tower until the last tenant left in 2007. The Tower has now been vacant for several years and was taken off of a protection list. This page is for anyone who feels this building is worth saving and reusing. I believe that it is a historical symbol of the Lehigh Valley and the Steel company. You may voice your opinion here, and please like and share the page with as many people as you can! You are free to share stories, memories and photos. I believe that together, the citizens of the Lehigh Valley and beyond can help to save this beautiful building! Thank you for your time and your appreciation!

Letter to the candidates (13)

(13th in a series of posts on candidates for election)

What questions shall Gadfly ask? See post 10 for a list asked of candidates for the two-year seat last year. Modify them? New ones? What’s on your minds?  Let Gadfly know. Pass the word that we hope Gadfly will be a great place to learn about candidates. Let’s turn out a big, informed vote!

Saturday, March 9

Willie, Michael, Paige, Grace, Carol, Will, David

One of my main goals in starting the Bethlehem Gadfly blog was to inform myself and to help others inform themselves about Council members and prospective Council members. Too many times I have voted with scant basis for my choices. And I know I am not alone. If voting means anything, it has to be informed voting. Good government starts with the best people.

So I need your help. Gadfly has about 200 followers. Serious people. People who pay attention. People who are involved. People who will talk to other people. People you should want to reach.

So I’m inviting you to use Gadfly as one of the means you use to motivate voters to choose you in the upcoming election. And in doing so you will spur the wide range of healthy dialogue and debate that energizes public participation.

I would like Gadfly to be one of the main places concerned Bethlehem residents come to learn about you.

Gadfly has a thread called “Candidates for election” that you can find on the top menu under “Serious Issues” or on the right-hand sidebar under “Topics.” There are posts about you there now. As you start to contribute, I will open a separate thread for each of you so that blog followers can easily consult, as it were, your response portfolio.

We have a little over 2 months to election. I would like to fill that time on Gadfly with as much substantive information about you and your views as possible.

I am open to just about whatever you want to contribute, but I will periodically feed you focused prompts.

And the first prompt is: “What uniquely qualifies you to serve (or to continue to serve) on Bethlehem City Council?”

In answering these prompts, I would like you to think of limiting yourself to one focused paragraph so that I can put together a handy comparative chart toward the end of the campaign period.

“What uniquely qualifies you to serve (or to continue to serve) on Bethlehem City Council?”

Will you join in? Your response to that prompt can be sent directly to me by email or through the “Contact” space (see top menu) on Gadfly.

You all deserve many tip o’ the hats for service rendered and/or for service sought. It takes a special kind of person. We are fortunate.

ED

A Northside Commuter Lot for Lehigh U? Let’s make sure fairness is in play (19)

(19th in a series of posts on Lehigh University)

This is the 3rd email in Gadfly’s recent conversation with the involved Lehigh and City parties over this puzzling issue of Lehigh’s “Northside Commuter Lot” and its possible negative effect on lower-paid Bethlehem residents and taxpayers who work at Lehigh.

Saturday, March 9

Brent, Darlene, and members of the Planning Commission (except Ms. Cohen, for whom I do not have a permissible email)

Take #3

There is a discrepancy here. The most obvious reason is that Lehigh has in some fashion (not a lease) made arrangement to use the Bethlehem Parking Authority Lot, discussed it openly with Lehigh employees as an option in their new parking plan, but not told the City, since Ms. Heller has no knowledge of it. But there are other possible interpretations as well.

My suggestion would be that the Planning Commission revoke its 2/21 approval till Lehigh explains the discrepancy, at which time the possible impact of bumping or forcing lower-wage Bethlehem residents, taxpayers, and voters into the Northside lot may be explored fully. There may be no problem, but let’s be sure.

The College of Health at 124 E. Morton is a major undertaking and a great additional distinction for the University and the City. The Mayor just highlighted it in Thursday’s “State of the City” address.

That new College and fair practices for lower-wage Bethlehem residents and taxpayers are not incompatible. Let’s just pause and make sure fairness is in play.

Here is evidence to consider–

Direct quotes from recording of the 2/21 Planning Commission mtg:

1) The Lehigh lawyer (so sorry, I don’t have her name): “[Lehigh has done] a study to prove and confirm to the city that with all these projects that would be coming both proposed now and what may be coming in the future that there’s adequate parking through out the campus based on the zoning ordinance requirements. That is public record here at the City, so whether Mr. Gallagher took the opportunity to review that, I don’t know. The lot that he’s talking about that there be a lease of some City lot does not exist, so the comments about lower income, lower whatever he’s trying to describe parking in that lot, there is no leasing of that City lot. And that is not even part of the parking study. The parking study took into account existing projects as well as the projects proposed. . . . There is no leasing of the lot with the City. All I can say is the lot you are claiming Lehigh is leasing is not under lease. . . . It’s not in the Comprehensive Plan. It’s not in the plan the City reviewed.”

2) Darlene Heller, Bethlehem Director, Planning and Zoning: “So that there will be some satellite parking spaces, none that I know of on the northside. . . .”

From the Lehigh Parking Study referenced above:

1) “The commuter lot is located on Goodman Campus [over the Mountain, Stabler Arena locale] with frequent bus service.” (32)

2) “Lehigh University intends to make use of off-site parking as an option for non-residential students at the Goodman Commuter lot.” (41)

From Lehigh U material on web site Sept 2018 and used as basis for widespread campus discussion throughout the Fall:

— see the attached image from the Campus Parking Map from the Lehigh U parking regulations document showing notation for Northside (other areas in the documentation reference bus service from the Northside lot to Farrington Square)

Northside 3

From personal conversation with a score of current Lehigh employees on Friday:

— everybody I talked with is aware of the Northside Commuter Lot in the mix of parking locations in the new plan

Assoc. VP Stringfellow and other Lehigh reps perhaps closer to implementation details of the parking plan than the Lehigh lawyer were present 2/21 but did not participate in discussion, though led to do so by Ms. Heller. Stringfellow is signator to the Sept 10, 2018, document that was circulated on campus that is the basis for my concern.

Ed Gallagher

On the road with Ron

https://88-photos.com/

Many Gadfly followers know Ron and Sharon Yoshida.

Ron was my boss for a while. yoshida

He is a great talker.

He talked me into things.

But now Ron is a walker.

As I write, he is a day or two or three into the arduous 88-Temple walk in Shikoku, Japan.

A multi-site pilgrimage of 88 temples associated with the Buddhist monk Kūkai (Kōbō Daishi), who lived c. 800.

A walk that will take about 60 days.

And not always on flat rail trails.

Temple 3Temple 1

 I knew he was walking. For exercise, I thought.

I had no idea what he was really walking for.

What IS he walking for? (See his T Minus 3: 27 February 2019 post)

He will reconnect with his Japanese roots.

I get that. Like many retirees, Gadfly has turned to genealogy, producing small books on each of his parents. And hoping to go back further.

Yoshida 3But there’s something more.

It’s contained in the answer from an Australian finisher of the walk to Ron’s question about what effect the journey had on him: he said that the pilgrimage “restored his faith in mankind.”

I get that too. There must be (for want of a better term) a spiritual dimension to Ron’s journey, his “pilgrimage.”

I envy him the quest for that goal. And hope for its completion.

So I’m going to follow Ron like he’s been following Gadfly.

Hoping something will rub off.

https://88-photos.com/

Join us, won’t you?

Buddha: “I am the awakened one.”

Why still the mystery about a Northside Commuter Lot for Lehigh U? (18)

(18th in a series of posts on Lehigh University)

Gadfly did some research in the City Hall vaults for this follow-up message.

Thursday, March 7

Take #2

Brent, Darlene, and members of the Planning Commission (except Ms. Cohen, for whom I do not have a permissible email)

On 2/21 the Lehigh lawyer (sorry, I did not catch her name) “invited” me to look at the July 18, 2018, parking study submitted to the City.

I did. And, indeed, it has nary a mention of a Northside Commuter Lot. Which is consistent with the first testimony I heard from Lehigh when I inquired whether all lost parking spaces could be absorbed on campus. And was told they could.

So how does that square with the appearance of the off-campus Northside Lot on this document on the Lehigh web site and in conversations with Lehigh faculty and staff in the Fall when news of the parking changes was rolled out?

See the Northside Commuter Lot mention on the lower right of this Campus Parking map.

In fact, here is a blow-up of that lower right corner of the map clearly showing the presence of the Northside Commuter Lot in the Lehigh parking plan:

Northside 3

Why before the Planning Commission is the existence of this lot not recognized?

The 2/21 Lehigh lawyer was careful to say that Lehigh has no lease for that lot. But she did not say that Lehigh wasn’t using it.

Is Lehigh using that lot? Has that use been approved? Why the mystery?

Ed

Lehigh University’s Multi-Modal Culture (9)

(9th in a series of posts on Walkability and Bikeability)

A Gadfly tip o’ the hat and wave o’ the wing to follower Tony Hanna (Redevelopment Authority Director) for recommending the work of Jeff Speck on this subject. Gadfly is reading Speck’s Walkable City books now.

Gadfly followers will recognize that he is engaged in a bit of a beef with Lehigh University over the possible negative impact of the new parking system on the lower income strata of workers, some of whom, no doubt, are Bethlehem residents, taxpayers – and voters.

But

that new parking system is the result of a laudably ambitious plan to foster a multi-modal culture on campus.

See: A New Mobility Ecosystem

“Lehigh University’s Connections Plan will reduce the reliance on the automobile for on campus travel, promote ridership and expansion of the Lehigh University transit system and encourage health and wellness through walking and cycling, resulting in a more collaborative, less congested, and more sustainable environment for students, faculty, staff, alumni, and visitors alike. The Connections Plan will seek to accomplish the following thematic goals:

  • Foster a multimodal culture
  • Achieve environmental sustainability
  • Enhance health & wellness
  • Minimize investment in new parking structures”

For more details, see the links on this main Connections page to The Pedestrian Experience, Transit System, Parking System, and Mobility Solutions for such specific sub-goals as:

  • Create a car-free zone of nearly 39 acres in the academic core of campus bounded by Packer Avenue, Taylor Street, University Drive, and Brodhead Avenue
  • Provide convenient, timely, and comfortable transportation options to eliminate vehicle dependence in the core of campus and provide access to all existing parking facilities
  • Limit vehicular access and parking throughout the core campus and establish the car-free zone
  • Partner with the public and private sector to deliver various transportation, carpool and ridesharing options (LANTA/LYFT/Enterprise).

Drilling down on the Pedestrian Experience, we find:

Pedestrian Experience

So there’s gonna be free Lanta, carpooling, car-sharing, bike sharing, etc., etc. – all kinds of things!

Gadfly has many followers on the Lehigh campus. Would anybody like to comment on this plan? It’s quite ambitious. Lehigh is built on the side of a hill (and I’ll bet somebody can tell us what degree of slope). Does the plan look good from your ground-level? Or how about other followers who are expert in such plans – is Lehigh on track?

Addendum to “dressing up the address”

(5th in a series of modest proposals)

Regarding Gadly’s last modest proposal:

So probably at 8AM this very moment I just  punched the “Send” button and perhaps the very moment you might be reading this, the Mayor is beginning his “State of the City” address to the Chamber of Commerce at a breakfast at Arts Quest.

Gadfly suggested a different venue and etc., etc. for this annual event.

As usual Gadfly enters these modest proposals on the record during public comment at Council meetings — and did so Tuesday night. It so happens the mayor was not there.

CM Reynolds took up the idea and suggested to Business manager Evans who was sitting in for the Mayor that this talk could be given during the Mayor’s report time at Council meetings.

Yes, it could.

But a couple things that CM Reynolds said struck me as not so good.

CM Reynolds said — paraphrasing now — 1) the talk is basically a bunch of slides and 2) it wouldn’t take too much time and require a different preparation. I hope I have that right.

Now that didn’t strike me quite right.

It made the “State of the City” event sound perfunctory to me.

I said last time that I’m not a big spectacle kind of guy (another wink-wink to you-know-who-you-are). And I rather dislike the wind-demon politicians who are always talking or who are all-talk. Especially if they are also no-action.

But I must admit that there are times that I want, that I need some rah-rah.

And an event called “State of the City” feels that way to me.

Respectfully, one time a year I’d like to have the Mayor throw away the slides and the stop-watch and light us up a bit.