Packer Ave: pre-pare to de-tour

logo Latest in a series of posts about Lehigh University and the Southside logo

The signs are up!

Packer between Vine and Webster
closed March 9 for 45 days

Here’s what we’re hoping:

1) The City will put out a story not only with the technical details of the closure

2) but also full details of the Lehigh “ask” that is behind the study

3) as well as the means for citizens to record their travel experiences during the temporary closure plus their thoughts on a permanent closure

4) and concrete plans for a community meeting to discuss the results and steps forward, including at least a tentative date for such.

In reference to #3, Gadfly will gladly receive your thoughts and impressions and photos, which don’t have to be long, which can be multiple, and of which he will keep a running log.

Happy trails!

Leave a Reply

Please log in using one of these methods to post your comment:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s